Note 13392

Geyser:Steamboat
Date/Time From:2019-08-25 @ 0747
Date/Time To:2019-08-25 @ 0807
Entrant:ypcaribou
Observer:Lori S
Time Entered:2019-08-25 13:30:59
Time Updated:2019-08-25 13:32:44
Time Uploaded:2019-08-25 13:32:44
Submitted to:Geysertimes.org
Note:Almost constant water down SV channel at bridge. Pool there looked empty of much gravel but I will defer to those more knowledgeable about that. Water pooling to right of the main spot at steerage. NV & SV low and angled every 1 to 2 min but not starting together. NV mostly initiating. Not tall but lots of water rushing down hill. NV channel dry. Base of tree and edge other side of NV bridge still steaming. Cold morning so SB water somewhat shrouded at times. Area behind and to right of SV damp. Maybe 3' x 3' square of white string secured to ground just below mid-deck Steamboat sign.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.