Note 7364

Geyser:Tantalus
Date/Time From:1967-09-20 @ 0800
Date/Time To:1967-09-20 @ 1615
Entrant:research-mab
Observer:1967 log
Time Entered:2017-09-25 17:38:55
Time Uploaded:2017-10-02 14:45:06
Submitted to:Geysertimes.org
Note:09/20/1967 Decker Geyser and Root Spring are both drained this morning. Decker was drained down 2½ feet but showed no signs of an eruption. Water from Echinus raised the level about 2 or 3 inches. This leaves several questions, 1) when did the drain down occur? 2) How far down had it drained? 3) was there an eruption someplace? Decker filled again at 4:15 pm.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.