Note: | Said to look better than yesterday. Some vertical elements in S, Vent early. First meek vertical in N. about 1245. Good minor push from 1300-1330 with a couple of Whoo-hoos. That took the trough from being about 1/4 dredged to 1/2 dredged. Nothing of note until a sustained but weak vertical minor about 1500, followed by some Billing 10 min. later. Then nothing before I left. Trough still 1/2 dredged at 1600. Cistern was witnessed several times to have wide area of boiling (3 vent) to 4-6" which disturbed nearly the entire pool. And was once reported to be boiling but from a fairly calm pool. More bubblers have reactivated in the W. runoff channel below the middle obs. deck. Eventually putting water all the way to the bridge. |