Note 15041

Geyser:Steamboat
Date/Time:2020-07-19 @ 1840
Entrant:cb
Observer:cb
Time Entered:2020-07-19 21:53:39
Time Uploaded:2020-07-19 21:56:11
Submitted to:GeyserTimes for Android
Note:7H Into the eruption. SB is in mixed water steam phase. NV mix of steam and water 40' continuously. SV is huffing tall billows of steam also continuously. SV runoff channel is wet with lots of pooling water in low depressions and a thin trickle of water all the way down the main channel to the foot bridge. Cistern Spring's pool has dropped ~2.5' below overflow. Pool is clear and mostly calm with the exception of 1 point of small ping pong ball sized bubbles that occasionally break the surface.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.