Note 27580

Geyser:Steamboat
Date/Time From:2023-08-14 @ 0810
Date/Time To:2023-08-14 @ 0825
Entrant:bbev
Observer:
Time Entered:2023-08-14 09:12:47
Time Uploaded:2023-08-14 09:12:47
Submitted to:Geysertimes.org
Note:Both vents active with NV tall and thick. Difficult to see SV, but runoff is steady, and light, with occasional increase in volume. Channel appears to be “whitening” somewhat, but could just be the lighting. Evidence of increased activity from SV, based on the gravel pit (formally referred to as the trough) being washed from last observation. Appears to have been some flow on the north side of the “pit” below the bridge. Steady, light runoff at steerage, with some change in color of the channel. CS remains low, only overflowing out the back channel. Muddy pool much lower than last week.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.