Geyser: | Steamboat |
Date/Time: | 2018-08-02 @ 0807 |
Entrant: | udo |
Observer: | |
Time Entered: | 2018-08-02 08:09:45 |
Time Updated: | 2018-08-02 08:10:52 |
Time Uploaded: | 2018-08-02 18:41:45 |
Submitted to: | GeyserTimes for Android |
Note: | Heavy runoff covered middle rock. Water is clear. Pit is dredged to bedrock all the way to the bridge. Only large gravel is left, smaller stuff is washed. Center channel is white sinter over 20 feet downstream from bridge |